Supervision of Repair Works for some Columns of Bab Albahr Hotel, Tripoli, Libya
Bonyan supervised implementation of the repair works and also Quality Control assurance for some of the columns on the ground floor located in the boiler room of Bab Albahr hotel in Tripoli.
The repair works were implemented by using concrete jackets.
Year of Completion: 2014.
Bonyan supervised implementation of the repair works and also Quality Control assurance for some of the columns on the ground floor located in the boiler room of Bab Albahr hotel in Tripoli.
The repair works were implemented by using concrete jackets.
Year of Completion: 2014.