Design of 220KV voltage transfer station in Hay Assalam area, Benghazi.
Design the foundations for the steel building and prepare the architectural and engineering designs of the building. The total area is about 2 hectares.
Year of Completion: 2007.
Design the foundations for the steel building and prepare the architectural and engineering designs of the building. The total area is about 2 hectares.
Year of Completion: 2007.