﻿<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Bonyan &#187; Products</title>
	<atom:link href="https://bonyan-ce.com/shop/feed/?product_cat=infrastructure" rel="self" type="application/rss+xml" />
	<link>https://bonyan-ce.com</link>
	<description>Consulting Engineers</description>
	<lastBuildDate>Mon, 28 Nov 2022 10:08:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.2.10</generator>
	<item>
		<title>Assessment and consultancy services of the grain silos buildings in the port of Misurata</title>
		<link>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-grain-silos-buildings-in-the-port-of-misurata/</link>
		<comments>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-grain-silos-buildings-in-the-port-of-misurata/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:12:34 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-grain-silos-buildings-in-the-port-of-misurata/</guid>
		<description><![CDATA[Providing consulting services to examine, test and determine ways to treat the concrete structure of the grain silos buildings in the port of Misurata. Year of Completion: 2021.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Providing consulting services to examine, test and determine ways to treat the concrete structure of the grain silos buildings in the port of Misurata.</p>
<p><em>Year of Completion:</em> <em>2021</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-grain-silos-buildings-in-the-port-of-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment and consultancy services of the public prosecutor building in the city of Tripoli.</title>
		<link>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-public-prosecutor-building-in-the-city-of-tripoli/</link>
		<comments>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-public-prosecutor-building-in-the-city-of-tripoli/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:12:26 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-public-prosecutor-building-in-the-city-of-tripoli/</guid>
		<description><![CDATA[Preparing a technical statement of the building’s structural elements, and offering a supportive supervision of implemented treatments. Year of Completion: 2021.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing a technical statement of the building’s structural elements, and offering a supportive supervision of implemented treatments.</p>
<p><em>Year of Completion:</em> <em>2021</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-public-prosecutor-building-in-the-city-of-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment and consultancy services of the water tank in the port of Misurata..</title>
		<link>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-water-tank-in-the-port-of-misurata/</link>
		<comments>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-water-tank-in-the-port-of-misurata/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:12:23 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-water-tank-in-the-port-of-misurata/</guid>
		<description><![CDATA[Providing consulting services to examine, test and determine ways to treat the concrete structure of the water tank in the port of Misurata. Year of Completion: 2021.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p><em>Providing consulting services to examine, test and determine ways to treat the concrete structure of the water tank in the port of Misurata.</em></p>
<p><em>Year of Completion:</em> <em>2021</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-and-consultancy-services-of-the-water-tank-in-the-port-of-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment of (25) multi-storey buildings located at the Airport Road area. Tripoli.</title>
		<link>https://bonyan-ce.com/product/assessment-of-25-multi-storey-buildings-located-at-the-airport-road-area-tripoli/</link>
		<comments>https://bonyan-ce.com/product/assessment-of-25-multi-storey-buildings-located-at-the-airport-road-area-tripoli/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 13:01:46 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-of-25-multi-storey-buildings-located-at-the-airport-road-area-tripoli/</guid>
		<description><![CDATA[NDT and laboratory testing works for the deteriorated elements due to corrosion activity for a number of (14) buildings consisting of 8 floors and 11 buildings of 12 floors (in addition to the ground floor and basement). Year of Completion: 2010.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p><em>NDT and laboratory testing works for the deteriorated elements due to corrosion activity for a number of (14) buildings consisting of 8 floors and 11 buildings of 12 floors (in addition to the ground floor and basement).</em></p>
<p><em>Year of Completion:</em> <em>2010</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-of-25-multi-storey-buildings-located-at-the-airport-road-area-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment of the concrete berths in Tripoli sea port and it’s out buildings</title>
		<link>https://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/</link>
		<comments>https://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:17:23 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/</guid>
		<description><![CDATA[Conducting on-site and laboratory tests of the reinforcement concrete for the structural elements of the Corniche berths up to the tarmac and conducting tests on the iron protection curtains (the area extending from Al Shaab port to the port of Tripoli port, approximately 2,600 meters long). Year of Completion: 2021.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Conducting on-site and laboratory tests of the reinforcement concrete for the structural elements of the Corniche berths up to the tarmac and conducting tests on the iron protection curtains (the area extending from Al Shaab port to the port of Tripoli port, approximately 2,600 meters long).</p>
<p><em>Year of Completion:</em> <em>2021</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment of the steel structure of the Al-Gomhoria Mall in Tripoli.</title>
		<link>https://bonyan-ce.com/product/assessment-of-the-steel-structure-of-the-al-gomhoria-mall-in-tripoli/</link>
		<comments>https://bonyan-ce.com/product/assessment-of-the-steel-structure-of-the-al-gomhoria-mall-in-tripoli/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:48:37 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-of-the-steel-structure-of-the-al-gomhoria-mall-in-tripoli/</guid>
		<description><![CDATA[Evaluating of the steel structure. Year of Completion: 2019.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Evaluating of the steel structure.</p>
<p><em>Year of Completion:</em> <em>2019</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-of-the-steel-structure-of-the-al-gomhoria-mall-in-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment of Wadi Alathel Bridge in the city of Zintan.</title>
		<link>https://bonyan-ce.com/product/assessment-of-wadi-alathel-bridge-in-the-city-of-zintan/</link>
		<comments>https://bonyan-ce.com/product/assessment-of-wadi-alathel-bridge-in-the-city-of-zintan/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 17:10:50 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-of-wadi-alathel-bridge-in-the-city-of-zintan/</guid>
		<description><![CDATA[Preparing a technical study of testing, investigation on-site examinations of Bridge. Year of Completion: 2022.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing a technical study of testing, investigation on-site examinations of Bridge.</p>
<p><em>Year of Completion:</em> <em>2022</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-of-wadi-alathel-bridge-in-the-city-of-zintan/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment works for 12 multi-storey buildings of the 964 units housing project located in Hadba area. Tripoli.</title>
		<link>https://bonyan-ce.com/product/assessment-works-for-12-multi-storey-buildings-of-the-964-units-housing-project-located-in-hadba-area-tripoli/</link>
		<comments>https://bonyan-ce.com/product/assessment-works-for-12-multi-storey-buildings-of-the-964-units-housing-project-located-in-hadba-area-tripoli/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 17:10:21 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-works-for-12-multi-storey-buildings-of-the-964-units-housing-project-located-in-hadba-area-tripoli/</guid>
		<description><![CDATA[&#160; Investigation and site supervision of the repair works. Year of Completion: Ongoing.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>&nbsp;</p>
<p><em>Investigation and site supervision of the repair works. </em></p>
<p><em>Year of Completion:</em> <i>Ongoing</i>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-works-for-12-multi-storey-buildings-of-the-964-units-housing-project-located-in-hadba-area-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CM/CS for Qaser Bin Ghashir Infrastructure Project, Tripoli, Libya</title>
		<link>https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/</link>
		<comments>https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/#comments</comments>
		<pubDate>Thu, 17 Mar 2016 16:56:49 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/?post_type=product&#038;p=717</guid>
		<description><![CDATA[The contract for Qaser Bin Ghashir Infrastructure project was awarded to the National Real estate Investment &#38; construction Co. (NRIC) in Feb 2008 by the Libyan Housing and Infrastructure Board (HIB), and the HIB&#8217;s Project Management contracted with Bonyan in Nov 2008 for Construction Management and Construction Supervision (CM/CS) of the project. The project comprises execution &#8230; <a href="https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/" class="more-link">Continue reading <span class="screen-reader-text">CM/CS for Qaser Bin Ghashir Infrastructure Project, Tripoli, Libya</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p style="text-align: justify;">The contract for Qaser Bin Ghashir Infrastructure project was awarded to the National Real estate Investment &amp; construction Co. (NRIC) in Feb 2008 by the Libyan Housing and Infrastructure Board (HIB), and the HIB&#8217;s Project Management contracted with Bonyan in Nov 2008 for Construction Management and Construction Supervision (CM/CS) of the project.</p>
<p style="text-align: justify;">The project comprises execution of full-infrastructure which includes water supply system (networks, tanks and pumping stations), sewage system networks, storm water drainage system and roads networks.</p>
<p style="text-align: justify;">Qaser Bin Ghashir town is located in the North East of Jfara area, 27Km south of the center of Tripoli, and Tripoli International Airport is approx. 4.0 Km west of the town.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Conceptual Bridge Design, Misurata, Libya</title>
		<link>https://bonyan-ce.com/product/conceptual-bridge-design-crossing-misurata/</link>
		<comments>https://bonyan-ce.com/product/conceptual-bridge-design-crossing-misurata/#comments</comments>
		<pubDate>Thu, 17 Mar 2016 16:42:37 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/?post_type=product&#038;p=712</guid>
		<description><![CDATA[This bridge is located at the interchange at the crossing of the coastal road with Misurata&#8217;s Steel Industry road  no. 5. The interchange is currently configured as a T-Intersection with a 2-lane roadway intersecting a 4-lane roadway. The client, Libya Housing and Infrastructure Board (HIB) intends to develop this crossing into a full interchange with &#8230; <a href="https://bonyan-ce.com/product/conceptual-bridge-design-crossing-misurata/" class="more-link">Continue reading <span class="screen-reader-text">Conceptual Bridge Design, Misurata, Libya</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p style="text-align: justify;">This bridge is located at the interchange at the crossing of the coastal road with Misurata&#8217;s Steel Industry road  no. 5. The interchange is currently configured as a T-Intersection with a 2-lane roadway intersecting a 4-lane roadway.</p>
<p style="text-align: justify;">The client, Libya Housing and Infrastructure Board (HIB) intends to develop this crossing into a full interchange with grade separation.</p>
<p style="text-align: justify;">Bonyan along with our international partner <a href="http://international partner KPFF">KPFF </a>formed a technical team and worked on the conceptual bride design together. The team started working on the project 30% design late 2010, but the works had been interrupted by the 17<sup>th</sup> of February revelation.</p>
<p style="text-align: justify;">By the end of the 2013 HIB expressed its intention to resume the 30% design work of the interchange. Subsequently, KPFF had restarted the conceptual and the alternative evaluation of the different design options. The main options included a full clover leaf, Single Point Urban Interchange, Diamond and Diverging Interchanges varieties, and other options with roundabout and tunnels. the client had chosen the &#8220;Full Clover Leaf&#8221; option as the preferred option for further development into a 30% design level per our original contract.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/conceptual-bridge-design-crossing-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
