﻿<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Bonyan &#187; Products</title>
	<atom:link href="https://bonyan-ce.com/shop/feed/?product_cat=concrete-technology" rel="self" type="application/rss+xml" />
	<link>https://bonyan-ce.com</link>
	<description>Consulting Engineers</description>
	<lastBuildDate>Mon, 28 Nov 2022 10:08:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.2.10</generator>
	<item>
		<title>Assessment of Load-Bearing Elements for New Equipment on Roof Tops for Libyana Co. Expansion Project, Libya</title>
		<link>https://bonyan-ce.com/product/assessment-load-bearing-roof-libyana-expansion/</link>
		<comments>https://bonyan-ce.com/product/assessment-load-bearing-roof-libyana-expansion/#comments</comments>
		<pubDate>Wed, 25 Jan 2017 12:33:45 +0000</pubDate>
		<dc:creator><![CDATA[]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/?post_type=product&#038;p=3255</guid>
		<description><![CDATA[Bonyan investigated more than 60 roof tops to assess the load bearing elements and study the possibility of installing an external equipment room above the ceiling of the sites, as part of Libyana mobile network operator extension project. NDT testing and structural analysis were applied to evaluate the field work load-bearing elements of the existing equipment Libyana &#8230; <a href="https://bonyan-ce.com/product/assessment-load-bearing-roof-libyana-expansion/" class="more-link">Continue reading <span class="screen-reader-text">Assessment of Load-Bearing Elements for New Equipment on Roof Tops for Libyana Co. Expansion Project, Libya</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Bonyan investigated more than 60 roof tops to assess the load bearing elements and study the possibility of installing an external equipment room above the ceiling of the sites, as part of Libyana m<span data-ved="0ahUKEwjWsIyaq93RAhVEWBQKHQWdBIgQ2koIbigCMBA">obile network operator </span>extension project. NDT testing and structural analysis were applied to evaluate the field work load-bearing elements of the existing equipment Libyana had installed on the surface of the sites.</p>
<p>The sites were located in each of Tripoli, Misurata, Garian and Nalut cities.</p>
<p>Bonyan has a new contract with Libyana for more sites and works are ongoing.</p>
<p><em>Year of Completion: 2016.</em></p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-load-bearing-roof-libyana-expansion/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>CM/CS for Qaser Bin Ghashir Infrastructure Project, Tripoli, Libya</title>
		<link>https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/</link>
		<comments>https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/#comments</comments>
		<pubDate>Thu, 17 Mar 2016 16:56:49 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/?post_type=product&#038;p=717</guid>
		<description><![CDATA[The contract for Qaser Bin Ghashir Infrastructure project was awarded to the National Real estate Investment &#38; construction Co. (NRIC) in Feb 2008 by the Libyan Housing and Infrastructure Board (HIB), and the HIB&#8217;s Project Management contracted with Bonyan in Nov 2008 for Construction Management and Construction Supervision (CM/CS) of the project. The project comprises execution &#8230; <a href="https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/" class="more-link">Continue reading <span class="screen-reader-text">CM/CS for Qaser Bin Ghashir Infrastructure Project, Tripoli, Libya</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p style="text-align: justify;">The contract for Qaser Bin Ghashir Infrastructure project was awarded to the National Real estate Investment &amp; construction Co. (NRIC) in Feb 2008 by the Libyan Housing and Infrastructure Board (HIB), and the HIB&#8217;s Project Management contracted with Bonyan in Nov 2008 for Construction Management and Construction Supervision (CM/CS) of the project.</p>
<p style="text-align: justify;">The project comprises execution of full-infrastructure which includes water supply system (networks, tanks and pumping stations), sewage system networks, storm water drainage system and roads networks.</p>
<p style="text-align: justify;">Qaser Bin Ghashir town is located in the North East of Jfara area, 27Km south of the center of Tripoli, and Tripoli International Airport is approx. 4.0 Km west of the town.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/cmcs-qaser-bin-ghashir-infrastructure/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Consulting services for examination and assessment of the crumbling buildings of old housing units, Bilkhair district. Tripoli.</title>
		<link>https://bonyan-ce.com/product/consulting-services-for-examination-and-assessment-of-the-crumbling-buildings-of-old-housing-units-bilkhair-district-tripoli/</link>
		<comments>https://bonyan-ce.com/product/consulting-services-for-examination-and-assessment-of-the-crumbling-buildings-of-old-housing-units-bilkhair-district-tripoli/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 11:04:47 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/consulting-services-for-examination-and-assessment-of-the-crumbling-buildings-of-old-housing-units-bilkhair-district-tripoli/</guid>
		<description><![CDATA[Examination and NDT testing works of 200 apartments/condos in many areas, including the Old City. BCE is also undertaking Site Supervision works for the project. Year of Completion: 2016.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Examination and NDT testing works of 200 apartments/condos in many areas, including the Old City. BCE is also undertaking Site Supervision works for the project.</p>
<p><em>Year of Completion:</em> <em>2016</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/consulting-services-for-examination-and-assessment-of-the-crumbling-buildings-of-old-housing-units-bilkhair-district-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Deterioration assessments of the reinforced concrete deck of the Libyan Iron and Steel Company (LISCO) harbor (bulk berth no.1). Misurata.</title>
		<link>https://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/</link>
		<comments>https://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 12:51:16 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/</guid>
		<description><![CDATA[Execution of NDT testing works to assess the structural  situation of the deck (about 384m in length, 36m in width), to determine the extent of the need of implementing a temporary support system for the concrete elements during treatment, by removing and re-implementing parts of the deck. Year of Completion: 2013.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Execution of NDT testing works to assess the structural  situation of the deck (about 384m in length, 36m in width), to determine the extent of the need of implementing a temporary support system for the concrete elements during treatment, by removing and re-implementing parts of the deck.</p>
<p><em>Year of Completion:</em> <em>2013</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Evaluation of concrete elements exposed to fire in the Electricity Power Plant in Al-Khums city.</title>
		<link>https://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field/</link>
		<comments>https://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:48:41 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/evaluation-of-concrete-elements-exposed-to-fire-in-the-electricity-power-plant-in-al-khums-city/</guid>
		<description><![CDATA[Preparing a technical study of testing, investigation on-site examinations of building. Year of Completion: 2018.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing a technical study of testing, investigation on-site examinations of building.</p>
<p><em>Year of Completion:</em> <em>2018</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
