﻿<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Bonyan &#187; Products</title>
	<atom:link href="https://bonyan-ce.com/shop/feed/?product_cat=maritime" rel="self" type="application/rss+xml" />
	<link>https://bonyan-ce.com</link>
	<description>Consulting Engineers</description>
	<lastBuildDate>Mon, 28 Nov 2022 10:08:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.2.10</generator>
	<item>
		<title>Assessment of the concrete berths in Tripoli sea port and it’s out buildings</title>
		<link>https://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/</link>
		<comments>https://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:17:23 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/</guid>
		<description><![CDATA[Conducting on-site and laboratory tests of the reinforcement concrete for the structural elements of the Corniche berths up to the tarmac and conducting tests on the iron protection curtains (the area extending from Al Shaab port to the port of Tripoli port, approximately 2,600 meters long). Year of Completion: 2021.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Conducting on-site and laboratory tests of the reinforcement concrete for the structural elements of the Corniche berths up to the tarmac and conducting tests on the iron protection curtains (the area extending from Al Shaab port to the port of Tripoli port, approximately 2,600 meters long).</p>
<p><em>Year of Completion:</em> <em>2021</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-of-the-concrete-berths-in-tripoli-sea-port-and-its-out-buildings/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Assessment of the water tunnel linking Al Saraya Al Hamra Lake and Al Shaab Port.in the city of Tripoli.</title>
		<link>https://bonyan-ce.com/product/assessment-of-the-water-tunnel-linking-al-saraya-al-hamra-lake-and-al-shaab-port-in-the-city-of-tripoli/</link>
		<comments>https://bonyan-ce.com/product/assessment-of-the-water-tunnel-linking-al-saraya-al-hamra-lake-and-al-shaab-port-in-the-city-of-tripoli/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 17:10:53 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/assessment-of-the-water-tunnel-linking-al-saraya-al-hamra-lake-and-al-shaab-port-in-the-city-of-tripoli/</guid>
		<description><![CDATA[Preparing a technical study of testing, investigation on-site examinations of the structural elements for the water tunnel linking Al-Saraya Al-Hamra Lake and Al-Sha’ab Port. Year of Completion: 2022.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing a technical study of testing, investigation on-site examinations of the structural elements for the water tunnel linking Al-Saraya Al-Hamra Lake and Al-Sha’ab Port.</p>
<p><em>Year of Completion:</em> <em>2022</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/assessment-of-the-water-tunnel-linking-al-saraya-al-hamra-lake-and-al-shaab-port-in-the-city-of-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Conducting preliminary studies for the establishment of a new port, in the city of Zawia</title>
		<link>https://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/</link>
		<comments>https://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 14:46:31 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/</guid>
		<description><![CDATA[Preparing preliminary studies such as a study and analysis of the existing situation and future expectations, and a technical, economic and environmental study. Year of Completion: Ongoing]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing preliminary studies such as a study and analysis of the existing situation and future expectations, and a technical, economic and environmental study.</p>
<p><em>Year of Completion: <em>Ongoing</em> </em></p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Deterioration Assessment of the R.C. Deck of LISCO Harbor, Misurata, Libya</title>
		<link>https://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/</link>
		<comments>https://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/#comments</comments>
		<pubDate>Sat, 28 Jan 2017 09:33:22 +0000</pubDate>
		<dc:creator><![CDATA[]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/?post_type=product&#038;p=3265</guid>
		<description><![CDATA[Bonyan undertook investigation and assessment works for the deteriorated reinforced concrete elements of  at bulk berth no. (1) of the Libyan Iron and Steel Company (LISCO) harbor. Works included execution of NDT testing to assess the structural  situation of the reinforced berth, which is ~  384m in length and 36m in width, to determine the extent &#8230; <a href="https://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/" class="more-link">Continue reading <span class="screen-reader-text">Deterioration Assessment of the R.C. Deck of LISCO Harbor, Misurata, Libya</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Bonyan undertook investigation and assessment works for the deteriorated reinforced concrete elements of  at bulk berth no. (1) of the Libyan Iron and Steel Company (LISCO) harbor.</p>
<p>Works included execution of NDT testing to assess the structural  situation of the reinforced berth, which is ~  384m in length and 36m in width, to determine the extent of the need of implementing a temporary support system for the concrete elements during treatment, by removing and re-implementing parts of the deck.</p>
<p><em>Year of Completion: 2013.</em></p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>IAR of the sewage treatment plant project in the city of Zliten.</title>
		<link>https://bonyan-ce.com/product/iar-of-the-sewage-treatment-plant-project-in-the-city-of-zliten/</link>
		<comments>https://bonyan-ce.com/product/iar-of-the-sewage-treatment-plant-project-in-the-city-of-zliten/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 17:01:27 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/iar-of-the-sewage-treatment-plant-project-in-the-city-of-zliten/</guid>
		<description><![CDATA[Preparation a technical statement of the status of the structural elements and damp-proof courses implemented in the sewage treatment plant. Year of completion: Ongoing.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p style="text-align: justify;"><em>Preparation a technical statement of the status of the structural elements and damp-proof courses implemented in the sewage treatment plant.</em></p>
<p style="text-align: justify;"><em>Year of completion: Ongoing.</em></p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/iar-of-the-sewage-treatment-plant-project-in-the-city-of-zliten/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Rehabilitation of Tripoli Harbor Berths nos. 15 – 33. Tripoli, Libya.</title>
		<link>https://bonyan-ce.com/product/rehabilitation-of-tripoli-harbor-berths-nos-15-33-tripoli-libya/</link>
		<comments>https://bonyan-ce.com/product/rehabilitation-of-tripoli-harbor-berths-nos-15-33-tripoli-libya/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 17:01:18 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/rehabilitation-of-tripoli-harbor-berths-nos-15-33-tripoli-libya/</guid>
		<description><![CDATA[Site Supervision and QA/QC of the rehabilitation works of the reinforced concrete elements of the berth of 2.5Km long. Year of Completion: 2011.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Site Supervision and QA/QC of the rehabilitation works of the reinforced concrete elements of the berth of 2.5Km long.</p>
<p><em>Year of Completion: 2011.</em></p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/rehabilitation-of-tripoli-harbor-berths-nos-15-33-tripoli-libya/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Testing, assessment and methods of repair of marine academy structural elements. Tripoli.</title>
		<link>https://bonyan-ce.com/product/testing-assessment-and-methods-of-repair-of-marine-academy-structural-elements-tripoli/</link>
		<comments>https://bonyan-ce.com/product/testing-assessment-and-methods-of-repair-of-marine-academy-structural-elements-tripoli/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 13:01:50 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/testing-assessment-and-methods-of-repair-of-marine-academy-structural-elements-tripoli/</guid>
		<description><![CDATA[implementation of insitu and laboratory testing and structural analysis to assess the structural condition of the building and lay out of remedial measures where necessary. Year of Completion: 2009.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p><em>implementation of insitu and laboratory testing and structural analysis to assess the structural condition of the building and lay out of remedial measures where necessary.</em></p>
<p><em>Year of Completion:</em> <em>2009</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>https://bonyan-ce.com/product/testing-assessment-and-methods-of-repair-of-marine-academy-structural-elements-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
