﻿<?xml version="1.0" encoding="UTF-8"?><rss version="2.0"
	xmlns:content="http://purl.org/rss/1.0/modules/content/"
	xmlns:wfw="http://wellformedweb.org/CommentAPI/"
	xmlns:dc="http://purl.org/dc/elements/1.1/"
	xmlns:atom="http://www.w3.org/2005/Atom"
	xmlns:sy="http://purl.org/rss/1.0/modules/syndication/"
	xmlns:slash="http://purl.org/rss/1.0/modules/slash/"
	>

<channel>
	<title>Bonyan &#187; Products</title>
	<atom:link href="http://bonyan-ce.com/shop/feed/?product_cat=industrial" rel="self" type="application/rss+xml" />
	<link>http://bonyan-ce.com</link>
	<description>Consulting Engineers</description>
	<lastBuildDate>Mon, 28 Nov 2022 10:08:17 +0000</lastBuildDate>
	<language>en-US</language>
	<sy:updatePeriod>hourly</sy:updatePeriod>
	<sy:updateFrequency>1</sy:updateFrequency>
	<generator>http://wordpress.org/?v=4.2.10</generator>
	<item>
		<title>Architectural &amp; structural design, for Low Voltage KVA Transfer Station 11</title>
		<link>http://bonyan-ce.com/product/architectural-structural-design-for-low-voltage-kva-transfer-station-11/</link>
		<comments>http://bonyan-ce.com/product/architectural-structural-design-for-low-voltage-kva-transfer-station-11/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 13:01:55 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/architectural-structural-design-for-low-voltage-kva-transfer-station-11/</guid>
		<description><![CDATA[Preparing architectural, structural &#38; Electrical design for the station. Year of Completion: 2017.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p><em>Preparing architectural, structural &amp; Electrical design for the station.</em></p>
<p><em>Year of Completion:</em> <em>2017</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/architectural-structural-design-for-low-voltage-kva-transfer-station-11/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Building roof assessment, towers, and soil tests at the company&#8217;s tower installation sites.</title>
		<link>http://bonyan-ce.com/product/building-roof-assessment-towers-and-soil-tests-at-the-companys-tower-installation-sites/</link>
		<comments>http://bonyan-ce.com/product/building-roof-assessment-towers-and-soil-tests-at-the-companys-tower-installation-sites/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 13:19:21 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/building-roof-assessment-towers-and-soil-tests-at-the-companys-tower-installation-sites/</guid>
		<description><![CDATA[Assessment building surfaces, towers, soil tests, site surveying of towers and equipment at the site, and designing structural elements, to choose the applicable treatment method and supervising their implementation, in order to install the communication towers, and its equipment. Year of Completion: Ongoing.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Assessment building surfaces, towers, soil tests, site surveying of towers and equipment at the site, and designing structural elements, to choose the applicable treatment method and supervising their implementation, in order to install the communication towers, and its equipment.</p>
<p><em>Year of Completion:</em> <em>Ongoing</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/building-roof-assessment-towers-and-soil-tests-at-the-companys-tower-installation-sites/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Conducting preliminary studies for the establishment of a new port, in the city of Zawia</title>
		<link>http://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/</link>
		<comments>http://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/#comments</comments>
		<pubDate>Thu, 24 Nov 2022 14:46:31 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/</guid>
		<description><![CDATA[Preparing preliminary studies such as a study and analysis of the existing situation and future expectations, and a technical, economic and environmental study. Year of Completion: Ongoing]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing preliminary studies such as a study and analysis of the existing situation and future expectations, and a technical, economic and environmental study.</p>
<p><em>Year of Completion: <em>Ongoing</em> </em></p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/conducting-preliminary-studies-for-the-establishment-of-a-new-port-in-the-city-of-zawia/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Design and Engineering of Control Room Extension GUP Jakhira.</title>
		<link>http://bonyan-ce.com/product/design-and-engineering-of-control-room-extension-gup-jakhira/</link>
		<comments>http://bonyan-ce.com/product/design-and-engineering-of-control-room-extension-gup-jakhira/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 11:04:49 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/design-and-engineering-of-control-room-extension-gup-jakhira/</guid>
		<description><![CDATA[Preparing architectural, structural, electrical, HVAC, drainage, and water supply designs, and supervising for construction works. Year of Completion: 2014.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing architectural, structural, electrical, HVAC, drainage, and water supply designs, and supervising for construction works.</p>
<p><em>Year of Completion:</em> <em>2014</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/design-and-engineering-of-control-room-extension-gup-jakhira/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Design of 220KV voltage transfer station in Hay Assalam area, Benghazi.</title>
		<link>http://bonyan-ce.com/product/design-of-220kv-voltage-transfer-station-in-hay-assalam-area-benghazi/</link>
		<comments>http://bonyan-ce.com/product/design-of-220kv-voltage-transfer-station-in-hay-assalam-area-benghazi/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 13:19:02 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/design-of-220kv-voltage-transfer-station-in-hay-assalam-area-benghazi/</guid>
		<description><![CDATA[Design the foundations for the steel building and prepare the architectural and engineering designs of the building. The total area is about 2 hectares. Year of Completion: 2007.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Design the foundations for the steel building and prepare the architectural and engineering designs of the building. The total area is about 2 hectares<strong><em>.</em></strong></p>
<p><em>Year of Completion:</em> <em>2007</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/design-of-220kv-voltage-transfer-station-in-hay-assalam-area-benghazi/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Deterioration Assessment of the R.C. Deck of LISCO Harbor, Misurata, Libya</title>
		<link>http://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/</link>
		<comments>http://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/#comments</comments>
		<pubDate>Sat, 28 Jan 2017 09:33:22 +0000</pubDate>
		<dc:creator><![CDATA[]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/?post_type=product&#038;p=3265</guid>
		<description><![CDATA[Bonyan undertook investigation and assessment works for the deteriorated reinforced concrete elements of  at bulk berth no. (1) of the Libyan Iron and Steel Company (LISCO) harbor. Works included execution of NDT testing to assess the structural  situation of the reinforced berth, which is ~  384m in length and 36m in width, to determine the extent &#8230; <a href="http://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/" class="more-link">Continue reading <span class="screen-reader-text">Deterioration Assessment of the R.C. Deck of LISCO Harbor, Misurata, Libya</span> <span class="meta-nav">&#8594;</span></a>]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Bonyan undertook investigation and assessment works for the deteriorated reinforced concrete elements of  at bulk berth no. (1) of the Libyan Iron and Steel Company (LISCO) harbor.</p>
<p>Works included execution of NDT testing to assess the structural  situation of the reinforced berth, which is ~  384m in length and 36m in width, to determine the extent of the need of implementing a temporary support system for the concrete elements during treatment, by removing and re-implementing parts of the deck.</p>
<p><em>Year of Completion: 2013.</em></p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/deterioration-assessment-deck-lisco-harbor-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Deterioration assessments of the reinforced concrete deck of the Libyan Iron and Steel Company (LISCO) harbor (bulk berth no.1). Misurata.</title>
		<link>http://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/</link>
		<comments>http://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 12:51:16 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/</guid>
		<description><![CDATA[Execution of NDT testing works to assess the structural  situation of the deck (about 384m in length, 36m in width), to determine the extent of the need of implementing a temporary support system for the concrete elements during treatment, by removing and re-implementing parts of the deck. Year of Completion: 2013.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Execution of NDT testing works to assess the structural  situation of the deck (about 384m in length, 36m in width), to determine the extent of the need of implementing a temporary support system for the concrete elements during treatment, by removing and re-implementing parts of the deck.</p>
<p><em>Year of Completion:</em> <em>2013</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/deterioration-assessments-of-the-reinforced-concrete-deck-of-the-libyan-iron-and-steel-company-lisco-harbor-bulk-berth-no-1-misurata/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Evaluation and assessment of the Civil Aviation Simulation building. Tripoli.</title>
		<link>http://bonyan-ce.com/product/evaluation-and-assessment-of-the-civil-aviation-simulation-building-tripoli/</link>
		<comments>http://bonyan-ce.com/product/evaluation-and-assessment-of-the-civil-aviation-simulation-building-tripoli/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 13:01:53 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/evaluation-and-assessment-of-the-civil-aviation-simulation-building-tripoli/</guid>
		<description><![CDATA[NDT testing works and structural analysis to determine the structural condition of the building, which consists of 5 sections separated by expansion joints. Year of Completion: 2008.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p><em>NDT testing works and structural analysis to determine the structural condition of the building, which consists of 5 sections separated by expansion joints.</em></p>
<p><em>Year of Completion:</em> <em>2008</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/evaluation-and-assessment-of-the-civil-aviation-simulation-building-tripoli/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Evaluation of concrete elements exposed to fire in the Electricity Power Plant in Al-Khums city.</title>
		<link>http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field/</link>
		<comments>http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:48:41 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/evaluation-of-concrete-elements-exposed-to-fire-in-the-electricity-power-plant-in-al-khums-city/</guid>
		<description><![CDATA[Preparing a technical study of testing, investigation on-site examinations of building. Year of Completion: 2018.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Preparing a technical study of testing, investigation on-site examinations of building.</p>
<p><em>Year of Completion:</em> <em>2018</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
		<item>
		<title>Evaluation of the concrete ring beam of the ethyl tank in the Amal oil field.</title>
		<link>http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field-2/</link>
		<comments>http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field-2/#comments</comments>
		<pubDate>Sat, 26 Nov 2022 10:49:07 +0000</pubDate>
		<dc:creator><![CDATA[admin2]]></dc:creator>
		
		<guid isPermaLink="false">http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field-2/</guid>
		<description><![CDATA[Evaluation the concrete ring beam which carries the metal tank load of 200,000 barrels of ethyl. Year of Completion: 2017.]]></description>
				<content:encoded><![CDATA[<div class="pf-content"><p>Evaluation the concrete ring beam which carries the metal tank load of 200,000 barrels of ethyl.</p>
<p><em>Year of Completion:</em> <em>2017</em>.</p>
</div>]]></content:encoded>
			<wfw:commentRss>http://bonyan-ce.com/product/evaluation-of-the-concrete-ring-beam-of-the-ethyl-tank-in-the-amal-oil-field-2/feed/</wfw:commentRss>
		<slash:comments>0</slash:comments>
		</item>
	</channel>
</rss>
